NPGA
ES

24°S  ·  01.0  ·  SERVICES

Operational services

Where the operation meets
the plant floor.

Services that happen on the plant itself: major shutdowns, domestic and international parts logistics, ITO support, counterpart engineering and safety coaching. Seven fronts with one line of technical accountability.

33°S  ·  02.0  ·  SERVICES

Service areas

02.0Seven services. One line of accountability.

Each service can stand alone or integrate with reliability engineering and project management.

Service i

Major Maintenance

Shutdown · Turnaround

Planning and execution of major shutdowns. Downtime carries a per-minute cost — the plan has to be ready before the button is pressed, not after.

  • Integrated shutdown plan by system
  • Contractor and resource coordination
  • Progress control and safe reactivation

Service ii

Domestic Parts & Supply Logistics

Sourcing of critical parts within Chile. Traceability, reliable lead times and criticality-based strategic stock — no surprises on the day of the failure.

  • Domestic supplier identification
  • Document traceability and lead times
  • Strategic stock by criticality

Service iii

International Parts & Supply Logistics

Sourcing and logistics of equipment and supplies from international markets. Direct OEM access and customs management — supplier lead time shouldn't be an opaque variable.

  • OEM supplier mapping
  • Customs and transport management
  • Multi-client framework agreements

Service iv

Counterpart Engineering Support

The client's technical team facing EPC contractors during a project. We defend the owner's interest — from deliverable review to disputed technical criteria.

  • Engineering deliverable review
  • Validation of technical criteria
  • Defense of the owner's interest

Service v

Construction & ITO Support

On-site technical inspection and supervision in the field. Whatever isn't inspected during construction shows up later as rework, delay or a failure during start-up.

  • Permanent or intermittent ITO
  • Quality and progress control
  • Executive reporting by milestone

Service vi

Logistics, Supply & Dispatch

Full supply-chain service for industrial operations. Logistics isn't an accessory — it's what makes the maintenance procedure happen on the day it was planned.

  • Operational procurement and supply
  • Warehousing and dispatch
  • Critical inventory management

Service vii

Safety Risk Identification & Control Coaching

Hands-on accompaniment for operating teams on safety culture. Risk is controlled in the conversation before the shift, not in the report after the incident.

  • Field-applied risk identification (IPER)
  • Incident and near-miss analysis
  • Visible leadership on safety
46°S  ·  03.0  ·  EVALUATION

Plan evaluation

03.0Four questions that separate a living plan from a filed one.

We use them on every engagement as the gateway to diagnosis. If the four answers don't hold up, the plan won't survive the first shift.

01

Does the plan exist and is it active?

Existence and currency check. Documented, known and applied.

02

Is it detailed and standard?

Clear, replicable step-by-step. Does not depend on the shift or operator.

03

Is the system effective?

Results validated in operation, not in slides. MTBF, MTTR, availability — numbers, not adjectives.

04

Are the competencies in place?

Staff capabilities certified by role and criticality. A plan isn't enough; you need the hands that execute it.

51°S  ·  04.0  ·  RESULTS

Expected results

04.0Measurable from the first quarter.

We don't promise abstract cultural transformation. What we deliver is measured against the same KPIs your Reliability team is already watching.

Indicator i

Availability

More plant uptime. Longer MTBF between events.

Indicator ii

Stoppages

Fewer unplanned events. Better prediction.

Indicator iii

MTTR

Faster repair when failure does occur.

Indicator iv

Accidents

Higher operational safety. Fewer avoidable incidents.

—  ·  05.0  ·  CONTACT

Let's talk

05.0Does your operation pass the four questions?

A first review, with no commitment, contrasting your plans against the framework we use on every engagement.